Basic Info.
Charge Method
Quick Charge
Efficiency
Mini 95%
IP Class
IP54
Output Power
84kw-144kw
Input Voltage
380V
After-sales Service
Online Support
Type
Fast EV Charging Station
Certification
CE, ISO
Warranty
12 Months
Transport Package
Wooden Case
Specification
700*600*1900mm
Trademark
TONHE
Origin
China
HS Code
8504409999
Production Capacity
100 Sets / Month
Product Description
√Multi-standerds fast DC charger ,free combination of CHAdeMO,CCS2 and AC Type 2
√Average efficiency ≥96% at nominal output power
√Ethernet/3G/4G/OCPP communication
√High protection grade as IP54
√APP operation or RFID authentication or plug and play
√CE certificate NB 1282
√OEM/ODM
√LOGO customize
Charger Specification: √Average efficiency ≥96% at nominal output power
√Ethernet/3G/4G/OCPP communication
√High protection grade as IP54
√APP operation or RFID authentication or plug and play
√CE certificate NB 1282
√OEM/ODM
√LOGO customize
Specification | Model | Three-gun fast charger CCS-CHAdeMO- AC Type 2 |
AC Nomal Input | Phases/Lins | 3 phase+neutral+PE |
Voltage | 400VAC±10% | |
Frequency | 50Hz±10% | |
Connector | AC Type-2,CCS 2,CHAdeMO | |
Output | Power | AC Type-2:22kw, CCS 2:50kw, CHAdeMO:50kw, |
Volatge | AC Type-2:380-480VAC, CCS 2:200-750VDC/1000VDC CHAdeMO:200-500VDC, | |
Cable Lenth | 5m | |
Cable Type | Charging cable and connecter permanently attached to EVSE (liquid cooled) | |
Electrial Parameter | Power Factor | ≥0.99,≥ 0.96 (Full Load) |
THD Value | ≤5% | |
Stable Voltage Accuracy | ≤±0.5% | |
Stable Current Accuracy | ≤±1% | |
Efficiency | ≥95% at nominal output power | |
Structure Design | Housing Material | Galvanized steel |
Installation Method | Vertical installation of ground | |
LED Indicator | 10 inches with 720 x 480 pixels TFT LCD Screen, user interface with touch screen or keypad.Toughened unbreakable glass to be used for display screen | |
ON-OFF (Start-Stop) Switches | Mandatory | |
Emergency Stop Button | Mushroom headed type | |
Payment Method | RFID CARD | |
Communication | Charegr v.s. Backend | Ethernet, and 2G/3G/4G |
Communication Protocal | OCPP1.6 | |
Environmental in dex | Working Temperature | -20ºC-+65ºC |
Storage Temperature | -40ºC-+65ºC | |
Working Altitude | ≤2000M | |
Atmospheric pressure intensity | 80 kpa to 110 kpa | |
Application Site | Indoor/Outdoor | |
Cooling Method | Forced air cool | |
Security Protection | Multiple Protection | Over Current, Under Current, Over Voltage, Residual Current, Surge Protection, Short Circuit, Earth Fault at input and output, Input Phase reversal, Emergency Shut-down with alarm, over temperature, Protection against electric shock. |
Warranty | 1 years | |
Package Information | Product Dimension | 700*600*1900(W*D*H) |
Net Weight | 230KG | |
External Packing | Wooden case | |
General Requirements | ||
Energy Transfer Mode | Conductive | |
Charging Mode | CHAdeMO - mode 4 - DC Fast Charging CCS 2.0 - mode 4 - DC fast charging Type-2 AC - mode 3 | |
Reliability and Serviceability | Modularity, self-diagnostic features, fault codes and easy serviceability in the field | |
System Structure | ||
Regulation Method | Regulated DC EV Charging Station with combination of CVC or CCC but not simultaneously | |
Isolation | Each output isolated from each other with proper insulation | |
Power Supply | DC EV charging station connected to AC mains | |
Charge control communication | Communicate by digital and analog signals | |
Interface inter-operability | Inter-operable with any EV supporting CCS or AC Type-2 (for each gun respectively) | |
Operator | Operated by a trained person or EV owner | |
Input Requirements | ||
Input Supply Failure Backup | Battery backup for minimum 1 hour for control system and billing unit, to enable activities such as billing, to be provided | |
Output Requirements | ||
No. of Outputs | 3 | |
Output Connectors | 3 output connectors | |
Output Connector Compatibility | AC Type 2: IEC 61851-22, IEC 62196-2 Mode 3 CCS: IEC 61851-23/24, IEC 62196-3, DIN 70121. CHAdeMO: IEC 61851-23/24, JEVS G 105, Rev. 1.2 compliant | |
Mechanical Requirements | ||
Mechanical Stability | Shall not be damaged by mechanical impact as defined in IEC 61851-1 | |
Mechanical Impact | Shall not be damaged by mechanical impact as defined in IEC 61851-1 | |
User Interface and Display Requirements | ||
Visual | Visual Indicators:Error indication, Presence of input supply indication, State of Charge process indication. Voice notifications:Voice Notifications: Related to start and stop of charging session in English | |
Support Language | English, with provision for additional regional languages | |
Display Messages | EVSE should display appropriate messages for user during the various charging states like:-Vehicle plugged in / Vehicle plugged out'-Duration since start of charge and kWh consumed'-User authorization status'-Fault Conditions-Metering Information: Consumption Units | |
Performance Requirements | ||
DC Output Voltage and Current Tolerance | DC Output current regulation in Constant Current Charging (CCC); ±2.5 A for the requirement below 50 A, and ±5% of the required value for 50 A or more DC Output voltage regulation in constant voltage charging (CVC); | |
Control delay of charging current in CCC | DC output current demand response time1 s Ramp up rate: 20 A/s or more.Ramp Down rate: 100 A/s or more | |
Descending rate of charging current | EVSE should be able to reduce DC current with the descending rate of 100 A/s or more | |
Periodic and random deviation(Current ripple) | DC Output current ripple limit of EVSE:1.5 A below 10 Hz, 6 A below 5 kHz, 9A below 150 kHz | |
Periodic and random deviation(Volatge ripple) | Max. Ripple voltage ±5 V. Max slew rate ±20 V/ms |
Company Introduction
Tonhe is a high technology enterprise specialized in innovation of technology, product and management in the power electronics industry, and R & D, manufacturing ,sales, operation and service of EV charger module&rapid charger point and related products , providing customers with system solution for the energy sector.
Tonhe was established in 1998 and got listed in 2015 with stock code 300491.
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00IndiqwmGwQbe/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00hnJVbfmWkEqM/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
Manufacturing Center
Tonhe has automatic production line with full automation in the previous production steps, and semi-automation in assembly and testing. Technological design and work fixture are designed and developed by the process technology department, ensuring product quality.
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00hFmWqDdgkaoM/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
Certification
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00lyJWkbdcQToC/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
EV Charging Station - SPECIFICS
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00WymVbsdFcTkC/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00lNdWqmJPptkM/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00cNJWkfwGLQqB/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00bFAikLJWytce/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
![Tonhe 240kw CE 3phase Charging Station EV Charging Piles](http://img6.grofrom.com/www.wayichargingshop.com/226f3j00cOJhboAKPaqe/Tonhe-240kw-CE-3phase-Charging-Station-EV-Charging-Piles.webp)
Q1. What is your term of packing?
A: Wooden case (pallet)
Q2. What is your term of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your term of delivery?
A: FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 7 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.