Basic Info.
Model NO.
SCE100-240-480-DC
Efficiency
94% (Full Load)
Maximum Input Current
250A
Charging Interface
GB or EU
Internet Connection
4G /Ethernet
Input Power Connection
3pH+N+PE(L1, L2, L3, N, PE)
Transport Package
Cardboard Box
Specification
7 inch LCD Touch screen
Trademark
SOJO or Customized
Origin
China
Production Capacity
10000
Product Description
Company Profile:
SOJO Electric Co., Ltd.,
1,Leading enterprises of power distribution industry in China
2,Wins"national Torch Program industrialization demonstration project certificate
3,The only enterprise pass KEMA certificate in China
Listed on Shenzhen Stock Exchange in April 2015.(Stock Code:300444)
4,Possess multiple international invention patents
5,Specializes in the R & D, production, sales and operation in new energy field
6,Owning a 350,000 m2 digital factory in middle of China
7,Set up in 2002 have rich experience in production
8,Annual output value over 5 billion RMB
9,Global Employees more than 2000 people
1) Wall-mounted AC charging pile can be installed in outdoor operation, but the top of the equipment should be equipped with a canopy to prevent rainwater from directly drenching the equipment;
2) According to the installation position shown on the left, drill the expansion bolts installation holes, install the expansion bolts and waterproof rubber gasket in sequence, fix the AC pile, install the waterproof rubber gasket at the top of the internal expansion bolts, fix it with nuts and then fix it with sealant;
3) Choose the appropriate position for the hook of the gun line by yourself and fix it with expansion bolts;
4) Reliably ground the body to avoid electric shock causing injury or death.
2) According to the installation position shown on the left, drill the expansion bolts installation holes, install the expansion bolts and waterproof rubber gasket in sequence, fix the AC pile, install the waterproof rubber gasket at the top of the internal expansion bolts, fix it with nuts and then fix it with sealant;
3) Choose the appropriate position for the hook of the gun line by yourself and fix it with expansion bolts;
4) Reliably ground the body to avoid electric shock causing injury or death.
Name | Parameters |
Input power connection | 3Ph + N + PE(L1, L2, L3, N, PE) |
AC input voltage | 400 VAC ± 10% |
AC input frequency | 50/60Hz |
Power factor | 0.98 (full load) |
Efficiency | 94% (full load) |
Charging interface | GB or EU |
Rated power | 240/360/480kW |
Output voltage | 200 ~ 1000 VDC |
HM Interface | 7 inch LCD Touch screen |
Shell material | Sheet metal/tempered glass |
Operating temperature | -20+50ºC |
Relative humidity | 5%~95% |
Maximum Output Current | 250A |
Communication protocol | OCPP 1.6 |
RFID system | ISO 14443 type A MIFARE DESFire EV1 |
Internet connection | 4G /Ethernet |
Protection class | IP54 |
Project case:
Certificate:
Customer Service:
We can provide customers with professional product advice and purchase options.
All emails will be responded with in 24 hours during working days.
We have online customer service in English, Japanese. You can communicate with ease, or contact us through email anytime.
All customers will get one-on-one service.
Storage and transportation of equipment:
There should be corresponding fastening measures during transportation to avoid strong vibration and bumps damaging the outer packaging of the equipment. Upon arrival, you should check whether there is any damage, if there is any transportation damage, you should negotiate with the transportation party and our company to solve the problem. After opening the box, you should immediately check whether the contents of the box are consistent with the packing list.
Packed equipment should be stored in a room with relative humidity ≤80% and ambient air temperature -10ºC~+40ºC. The storage place should be dry, clean, air circulation, and can prevent the intrusion of all kinds of harmful gases, it is strictly prohibited to store with corrosive substances in the same place.
Our factory:
FAQ
Q1.Are you a factory or trading company?
A: We are a professional manufacturer of new and sustainable energy applications .
Q2.What is the warranty?
A: 12 months. In this period, we will supply technical support and replace the new parts by free, customers are in charge of delivery.
Q3. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q4. What is your terms of trade?
A: EXW, FOB, CFR, CIF, DAP,DDU,DDP
Q5. How about your delivery time?
A: Generally, it will take 3 to 7 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q7. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q8. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q1.Are you a factory or trading company?
A: We are a professional manufacturer of new and sustainable energy applications .
Q2.What is the warranty?
A: 12 months. In this period, we will supply technical support and replace the new parts by free, customers are in charge of delivery.
Q3. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q4. What is your terms of trade?
A: EXW, FOB, CFR, CIF, DAP,DDU,DDP
Q5. How about your delivery time?
A: Generally, it will take 3 to 7 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q7. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q8. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.